News

click

News

  • October 2011 – GERMANY: Argos attends at InterAirport 2011 Trade Fair in Munich.
  • September 2011 – ITALY: Argos introduces SMF/ODS instrument for obstacle free plan assessment.
  • August 2011 – TURKEY: Argos wins tender for PAPI testing instrument.
  • July 2011 – CANADA: Partnership with IDS/NA
  • July 2011 – GREECE : Live demo against Flight Check. SMF/PAPI exploit a great result certified by Hellenic CCA reference letter: SMF/PAPI wins in accuracy and in saving costs.
  • July 2011 – MEXICO: Mexican CAA certifies SMF/PAPI for maintenance and calibration of PAPI lights.
  • May 2011 – ITALY: Argos introduces SMF/ALS instrument for elevated approach light measurement.
  • April 2011 – ITALY: Argos introduces SMF/SIGN instrument for vertical guidance sign measurement.
  • February 2011 – ITALY: Partnership with Technosky for servicing in all ENAV Italian airports.
  • February 2011:
    1. Contract with AERADRIA for PAPI measurements at Rimini Airport in the year 2011
    2. Contract with AERELBA for PAPI measurements at Marina di Campo Airport in the years 2011 – 2012
    3. Contract with TECHNO SKY for OJT, use, and maintenance of Argos SMF/PAPI and SMF/M on 24 Italian Aiports
    4. Contract with Nano for Measurement and Calibration Co.Ltd. (Sudan) for the supply of q.ty 1 SMF/PAPI and training course

  • January 2011:
    Visit of Mr. Mbunga Siku and Mr. Francisco Pundi from ENANA – EP ( Angola) image
    From 24 to 26 January 2011 Mr. Mbunga Siku and Mr. Francisco Pundi from ENANA – EP visited Argos Ingegneria. During their visit, they attended the Factory Acceptance Test of ENANA SMF/PAPI before its shipment to Luanda Angola. A live demonstration of the SMF/CLC calibrator has been also given to the guests, to show the great advantage of users in calibrating the SMF/PAPI on their own instead of sending it back to Argos for the periodical checks.
    image Training course for AZIMUT engineers (Russian Federation). From January 31 to February 3, a training course on SMF/PAPI and SMF/M has been held on Argos Ingegneria premises to AZIMUT engineers. The course consisted in a theoretical session in Argos labs and a practical session first at Argos test range and then at Perugia Airport.

    image
    Training course on SMF/PAPI for CENAVE was held in Lagos Airport (Nigeria) from 31 January 2011 to 4 February 2011. Field test of the course was attended in Abuja Airport (Nigeria).



  • November 2010:
    1. Contract with ENANA-EP (Angola) for the supply of q.ty 1 SMF/PAPI and training course.
    2. Visit of Dr. Harold Demuren President of ICAO 37th General Assembly image
    On November 10th2010, Dr. Harold Demuren President of ICAO 37th General Assembly visited Argos Ingegneria, where he had the opportunity to assist to the demonstration of SMF/PAPI and SMF/M besides the presentation of other Argos main products such as R.S.A.M.S. and GVMS.


  • September 2010:
    Intertek, a FAA third party certifier, carried out with success technical and environmental performance evaluation tests on Argos Ingegneria SMF/PAPI.
  • June 2010:
    Argos Ingegneria is present at the Expo Aero Brasil 2010, San José dos Campos from 17th to 20th June 2010, Purple Hall Booth 11-12 Italian Pavillion, Stand 6.
  • June 2010:
    Contract signed with Fernau for the installation of VDF systems at Reggio Calabria airport and at Foggia airport.
  • May 2010:
    Contract signed with CJSC "NPO ATLAS" (Russia) for the supply of SMF/L, a system to perform indoor checks of the AGL characteristics before the installation on field.
  • April 2010:
    Argos Ingegneria is present at the Airport Show 2010, Dubai 25 – 27 April 2010, West Hall, Italian Pavillon, Stand WH7.
  • March 2010:
    Contract signed with Fernau for the installation of VDF systems al Forlì airport and at Padova airport.
  • January 2010:
    Contract awarded for the supply of a SMF/PAPI to AENA (Spain) through Argos Ingegneria distributor for Spain, G.R.P. Illuminacion, S.A., for the calibration of PAPI units in AENA airports.
  • December 2009:
    Contract signed with S.E.A. for the supply of a SMF/PAPI system to be used for the calibration of Milano Malpensa Airport PAPI units.
  • October 2009:
    Las Vegas IES annual meeting U.S.A., 25 to 29 October 2009
    Argos Ingegneria in cooperation with ACS exclusive U.S.A. distributor for Argos, presented a paper on performance of Argos PAPI Alignment tool reviewing the tests conducted by FAA in Atlantic City and in Vero Beach, where it has been evidenced the great advantage of SMF/PAPI unit to allow PAPI manufacturers to accurately and very efficiently (about 20 minutes) assess the performance of  PAPI units, including the very delicate  aspect of their focusing.
  • October 2009:
    Kansai (Osaka), 30 September to 8 October 2009-10-20
    Aerodromes Panel (AP), Visual Aids Working Group (VAWG) 7th meeting.
    During the meeting, following the suggestion of the VAWG, it has been decided to re-arrange paragraph 8.3.18 of Aerodrome Manual Part 4, in order to recommend the use of specific high precision electronic equipment, based on computer image analysis for a more precise check of PAPI units tuning.
  • October 2009:
    Argos Ingegneria at inter airport Europe 2009, Munich, 6 – 9 October Hall B5 Stand 756
  • September 2009:
    Contract signed with Milano Linate Airport for PAPI alignment measurements for the year 2010